PAH Design

Generator Load Bank

E-mail Print PDF

 

 

Why try to load the generator? The aim is to test the transmitter power to achieve true published in the catalog and meet operational requirements or system devices? ... And when conducting load testing, the calibration parameters of generators will be made to suit the actual operating conditions.
Typically, there are two ways to try to load the generator: the first way is to try using actual load of the building or plant. The second way is to try by downloading fake. Each method has its own advantages & disadvantages.
We have full Resistive Load Bank (cos phi = 1) and Reactive Load Bank (cos phi = 0.8) with a capacity of from a few kilowatts to tens MVA goods.
Please contact our Technology Co., Ltd Minh Phuong, your guests will be consulted reasonable load testing methods, most cost savings.
Why try to load the generator? The aim is to test the transmitter power to achieve true published in the catalog and meet operational requirements or system devices? ... And when conducting load testing, the calibration parameters of generators will be made to suit the actual operating conditions. 
Typically, there are two ways to try to load the generator: the first way is to try using actual load of the building or plant. The second way is to try by downloading fake. Each method has its own advantages & disadvantages. 
We have full Resistive Load Bank (cos phi = 1) and Reactive Load Bank (cos phi = 0.8) with a capacity of from a few kilowatts to tens MVA goods. 
Please contact our Minh Phuong Technology Co., Ltd , your guests will be consulted reasonable load testing methods, most cost savings.